A private security guard working at the Jefferson Park CTA Terminal, 4917 N. Milwaukee Ave., reportedly returned fire after a group of three people started harassing him and then fired read story
Ground broken for stormwater diversion tunnel
A groundbreaking ceremony for the Albany Park storm water diversion tunnel was held on May 22. The purpose of the tunnel is to reduce or eliminate flooding in the area.
The 18-foot tunnel 150 feet below ground level will divert 2,300 cubic feet of water per second about 1.4 miles from the North Branch of the Chicago River to the North Shore Channel. It will have an intake shaft at a bend in the river in Field Park just east of Pulaski Road, and go into operation before the water level reaches flood stage.
The $70 million project will produce an estimated 250 construction jobs. Completion is scheduled for the spring of 2018.
Work on the project will be visible at two ground-level locations, at the inlet shaft off Foster Avenue east of Pulaski and at the outlet shaft in River Park on the east side of the North Shore Channel. This month and next, staging for construction will take place over the next month, with park closing and relocation of the walking path.
Excavation and construction of the concrete inlet and outlet shafts from July through the end of the year, and community meetings will be held before any blasting is done. The work in 2017 will include below-ground tunnel boring.
The ceremony was attended by Mayor Rahm Emanuel, Alderman Margaret Laurino (39th), U.S. Senator Dick Durbin, U.S. Representative Mike Quigley, Metropolitan Water Reclamation District Board of Commissioners President Mariyana Spyropoulous and officials of the Chicago Department of Transportation.
"No resident of the city of Chicago should have to live in fear of the type of devastating floods that Albany Park residents have lived through twice in recent years," Emanuel said. "A project of this magnitude takes teamwork, and we are very pleased to work with our partners at the federal, state and local level to get this work under way and deliver the 21st Century infrastructure that the residents of this neighborhood need and deserve."
"This drainage tunnel will eliminate the danger of floods that have plagued our Northwest Side neighborhood for more than a century," Laurino said. "In the meantime, we’ve coordinated protective safety measures with CDOT and the Chicago Office of Emergency Management and Communications against potential flooding. We’ve also pledged to keep residents updated on the tunnel project completion."
Weekly Digital Edition
Read every story. Skip every pop-up.
Get the full weekly edition delivered to your inbox — no interruptions, no waiting. Just local news the way it was meant to be read.
This is just part of today’s coverage. Get the full story - every article, every ad, every page. Subscribe now.
The Latest From Our Community
A man was stabbed in his hand at about 4:50 a.m. Monday, Aug. 10, on a CTA Blue Line train near the Harlem station, 5550 N. Harlem Ave., after a read story
by BRIAN NADIG 45th Ward Democratic Committeeperson Michael Rabbitt and his Dems 45 organization have endorsed Jefferson Park resident S Gronkiewicz-Doran in the ward’s aldermanic race, which will be held read story
by BRIAN NADIG A new business, possibly a daycare, is in the works for the former CVS Pharmacy at the southeast corner of Milwaukee and Lawrence avenues. The pharmacy closed read story
by BRIAN NADIG A possible suspect is in custody after gunfire was reported at or near the Jefferson Park CTA Terminal, 4917 N. Milwaukee Ave., at about 5:20 a.m. Saturday, read story
by BRIAN NADIG A luxury hotel and spa for cats is planned for a vacant one-story office building at 5510 W. Montrose Ave. in the Jefferson-Portage Park area. Local resident read story
Browse by Category
Weekly Digital Edition
Read every story.
Skip every pop-up.
No pop-up ads — ever. Just stories, the way they were meant to be read
Full weekly edition delivered to your inbox every week — no waiting, no missing issues
Support local journalism and help keep our community connected
Only $19.50/year
That's less than 38¢ a week
Purchase Digital Subscription
Paypal
$19.50
/year
You can submit your payment via Paypal with a Credit Card. You DO NOT NEED TO HAVE A PAYPAL ACCOUNT.. Just click the “Paypal Subscribe” button below to iniate your secure payment! You will be directed to a Secure Paypal page in which you can pay with a Paypal account if you have one, or you can select "Pay with Debit or Credit Cardt" option below and process your payment via credit card.
Venmo
$19.50
/year
You can submit payment of $19.50 for a 1 year subscription to Nadig Newspapers' Venmo account using this link. Please include the email address in the comment/note section that you would like the digital subscription sent to.